Top Right Link Text

Portfolio

Valley Bible Fellowship – The Soul Factory

Bakersfield, CA

Vision

  • Create an innovative, customized space to fit a growing 12,000-member church for the lowest possible cost.
  • Build a facility that matches the industrial structures in the surrounding area.
  • Portray the Pastor’s vision of “Turning the Church Inside Out.”

Challenge

  • Get it designed and built in 8 months, on time and on budget.
  • Local quotes all came in too high and they needed at least 40,000 square feet of space.
  • Reduce HVAC costs and noise control.
  • Design acoustics and stage for a good rock ‘n roll feel, as well as large productions.

Solution

  • The design build team value engineered a solution to come in at under $200.00 a square foot for a total of $7.5 million, compared to the initial bid of $12 million.
  • CharestCorp designed a 190-foot clear span metal frame structure which literally turned the church inside out by revealing the structural steel on the outside of the building.
  • The sanctuary capacity of 3,900 people was designed for future expansion. It was specifically engineered to be “ready-made” for a mezzanine that would eventually seat an additional 2,500 church members.
  • VBF’s HVAC system was designed to be high volume and low velocity for the large space. It was built into the stage (underneath) and still today is completely silent.

Quick Facts

Year built: 2007
Construction time: 6 months
Approx. size: 40,000 sf
Seating Capacity: 3,900